Notes on building & shipping
Practical writing on shipping MVPs fast and putting AI into production — from the team that does it.
Jun 1, 2026 · 5 min read
How to ship an MVP in weeks, not months
The difference between a six-week launch and a six-month slog is rarely engineering speed — it’s scope discipline. Here’s how we cut MVPs to the bone without cutting value.
May 12, 2026 · 6 min readRAG that survives production
Retrieval-augmented generation demos in an afternoon and breaks in a week. What separates a prototype from a system you can trust in front of users.
